Woke up to about 3-4 inches of snow so I started off the day by clearing the driveway and adding more to the bobsled track. I'd like to build the start up another foot or so, but I need to widen the base of the pile a lot first.
Woke up to about 3-4 inches of snow so I started off the day by clearing the driveway and adding more to the bobsled track. I'd like to build the start up another foot or so, but I need to widen the base of the pile a lot first.